2025

2025
Foundation Drainage & Limestone Retaining Wall
Installation of a subsurface drainage system and natural limestone retaining wall, finished with drainage stone to manage water around the building and create a cleaner, more stable landscape.
The Challenge
The sloped area surrounding the building was overgrown and lacked a clearly defined drainage path, creating the potential for water to collect or travel toward the structure.
Our Approach
The area was cleared and excavated before installing perforated drainage pipe in a prepared stone base. A natural limestone retaining wall was then constructed to stabilize and define the grade, with drainage stone installed throughout the surrounding bed.
The Result
A cleaner and more controlled landscape with improved water management, stabilized elevation changes, and a limestone wall that complements the property’s existing stonework.







